Wednesday, October 15, 2003
Sigh of relief. Made it through on a very important logo job - really had a challenge put in front of us and that made it fun and a bit stressfull as well. Good to keep the blood pumping.

Put up the 1st railing of the shelving in the storage closet today. It was a snap after that. Although, in the drywall section the space I ran through some metal framing - may have to shift the rails down a few inches. Bummer.

11:16 PM  |  PERMALINK    


Tuesday, October 14, 2003
Brutal day at the dentist. Sometimes it just seems like you are there forever. Then you leave with half their monthly supply of novacane slowly sleeping through your face. Some interesting battles with taking in fluids and then your back to normal. Aw, the dentist.
11:58 PM  |  PERMALINK    


Monday, October 13, 2003
Parts of the plans! All set for construction in the new loft. I'm so excited about it - the additions and modifications will really add a great deal to the overall value of the property. Not to mention the fancy closet gear I'm putting into each main bedroom closet.


11:08 PM  |  PERMALINK    


Sunday, October 12, 2003
The projects begin. New closets! Tore down the existing crappy white shelving stuff and slopped some putty over the giant holes left in the walls. Got this cool stuff that goes on pink and dries white - it changes color to let you know when it is dry. Kind of cool. Worked out pretty good - plus it is a lot like smearing bubble yum all over the wall and we all know how much fun that can be.






10:40 PM  |  PERMALINK